Aerial view of an ammonia and urea fertilizer complex, with three white domed storage tanks and process units
Founder’s record

The experience behind the company

TEMCO was founded recently. Its general manager has been building storage tanks since the mid-1990s. The projects below were delivered in his roles at Petrojet and Orascom Construction, and they are the reason TEMCO can take on the work it does.

TEMCO's founder on site in hard hat and high-visibility vest, with a storage tank under construction and a crane behind

Hassan Abdelsattar Abdelsalam

Founder & General Manager

An engineer with three decades of mechanical construction experience across Egypt, Algeria and Iraq. His career has centred on storage tanks: fixed and floating roof, single and double shell, in carbon steel, stainless steel and 9% nickel cryogenic service, alongside pressure vessels, process piping and structural steel. He holds a B.Sc. in Mechanical Engineering (Power) from Menoufia University.

30+Years of site experience
90+Storage tanks erected
35+Coded pressure vessels
3Countries
Specialisms
  • Field-erected tanks, fixed & floating roof
  • Double-shell ammonia & 9% Ni cryogenic tanks
  • Pressure vessels, ASME U-Stamp fabrication
  • Process and utility piping systems
  • Steel structures, stacks and air intakes
Codes & inspection
Codes
ASME · API
Client specs
Aramco · Technip · Uhde · TTIL · AGIP
Testing
Hydrostatic · pneumatic · leak
Tank checks
Vacuum · peaking · banding · verticality
Selected earlier projects · Petrojet
ProjectLocationClientScope
MIDOR RefineryAlexandria, EgyptTTIL-SNCSite workshop prefabrication of 55 storage tanks; mechanical construction support; fabrication supervision
Burullus Gas ProjectEgyptBechtelConstruction supervision, expediting and site management
Alexandria Petroleum UpgradeAlexandria, EgyptAlexandria Petroleum CompanyErection of six 30,000 m³ storage tanks; fire and foam systems; cooling systems
South Dabaa PetroleumEgyptDAPETCOPrefabrication of four fixed-roof storage tanks, 33,000 m³ each; four skid manifolds; construction supervision
Ethylene Plant, Sidi KrirEgyptToyo Engineering CorporationErection of four 10,000 m³ storage tanks; fire, foam and cooling water systems; 6,000 t structural steel erection
69Storage tanks fabricated or erected
6,000 tStructural steel on a single plant

This is the experience behind every scope we price.