Aerial panorama of a power plant tank farm at sunset, with storage tanks, stacks and generation units
Founder's project experiencePower

Assiut Simple Cycle & Combined Cycle Power Plant

A 1,500 MW addition to Egypt's national generation capacity, delivered first as a fast-track simple cycle plant and then converted to combined cycle on an operating asset.

Employer of record
Orascom Construction
Owner
Upper Egypt Electricity Production
Main contractor
Orascom Construction
Location
Assiut, Egypt
Duration
Eight years continuous
1,500 MWGeneration capacity
8 yearsContinuous on site
4Tank service categories
Project overview

A 1,500 MW addition to Egypt's national generation capacity, delivered first as a fast-track simple cycle plant and subsequently converted to combined cycle.

Mechanical responsibility covered the full balance-of-plant scope, taking the plant tank farm, process and utility piping systems, rotating equipment and structural steel through testing, mechanical completion and pre-commissioning.

Scope of work

Storage tanks

  • Demineralised water tanks
  • Condensate storage tanks
  • Fire water storage tanks
  • Diesel fuel storage tanks
  • Tank foundations, fit-up, welding and hydrotesting

Piping systems

  • Steam and condensate piping
  • Cooling water piping
  • Firefighting piping networks
  • Process and utility piping
  • Pipe supports and modular steelwork
  • Pickling and passivation of stainless systems

Equipment & completion

  • Pumps, heat exchangers and valves
  • Lube oil and closed cooling water systems
  • Service water, compressed air and chemical dosing
  • Structural steel and equipment foundations
  • Hydrotesting and mechanical completion
  • Pre-commissioning support
Why it matters
  • 01Eight years of continuous mechanical construction leadership on a single asset
  • 02Complete tank farm erection across four service categories
  • 03Both greenfield erection and brownfield conversion of an operating plant
  • 04Full balance-of-plant mechanical ownership through pre-commissioning
On site
Power plant under construction, with storage tanks at various stages of erection, tower cranes and a stack
Engineers in high-visibility vests and hard hats descending the stairway of a storage tank, with a scaffolded tank under construction behind
Site team walking past a large storage tank wrapped in scaffolding during erection
Site personnel in high-visibility vests walking in front of gas turbine generation units under construction
Ground-level view across a tank farm mid-erection, several tanks at different stages

Let’s discuss your scope.