Skip to content

+20 100 658 9757 · office@temco-eg.com

Ground-level view across a tank farm mid-erection, several tanks at different stages
Capability

Testing & pre-commissioning

The scope that turns erected steel into a system ready for commissioning: pressure and leak testing, chemical cleaning of stainless surfaces, inspection documentation and mechanical completion.

Scope of work
  • Hydrostatic testing
  • Pneumatic and leak testing
  • Tank vacuum box testing
  • Chemical pickling and passivation
  • NDT coordination and inspection support
  • Punch listing and clearance
  • Mechanical completion dossiers and handover
Codes & standards
Welding qualification
ASME Section IX
Tank testing
API 650 hydrostatic & vacuum box
Documentation
ITPs · hold points · completion dossier

Let’s discuss your scope.