About TEMCO

An Egyptian industrial mechanical contractor

Who we are

TEMCO specialises in mechanical construction, storage tanks, industrial piping systems, steel fabrication, equipment installation and maintenance services for the oil & gas, petrochemical, water, desalination, power, infrastructure and heavy industrial sectors.

Established by a founder with decades of proven industry experience, particularly in storage tanks and piping, we combine engineering expertise, disciplined project management and skilled execution to deliver safe, reliable, high-quality mechanical solutions, from fabrication and construction through testing, commissioning and project handover.

Our commitment is to build long-term partnerships by consistently delivering projects with technical excellence, operational efficiency and uncompromising safety.

Our mission

To deliver safe, high-quality mechanical construction solutions through experienced leadership, skilled personnel and efficient project execution, while creating lasting value for our clients.

Core values
  • Safety

    Every scope planned to HSE requirements before a single joint is fitted.

  • Quality

    Executed to ASME and API codes, with inspection and documentation built into the programme.

  • Reliability

    Mechanical completion delivered to the construction schedule, not around it.

  • Partnership

    We work as an extension of the main contractor's team, not as a line item.

How we work

Five stages, agreed before we mobilise

  1. 01

    Understand the scope

    Drawings, specifications, codes and site constraints reviewed before we price, so the number we give is the number we deliver.

  2. 02

    Plan and mobilise

    Method statements, ITPs, welding procedures, manpower and lifting plans agreed with the main contractor ahead of mobilisation.

  3. 03

    Fabricate and erect

    Workshop and field execution to approved procedures, under QA/QC hold points and continuous dimensional control.

  4. 04

    Test and clean

    Hydrostatic, pneumatic and leak testing; pickling and passivation; NDT coordination and inspection documentation.

  5. 05

    Complete and hand over

    Punch clearance, mechanical completion and dossier handover, leaving the system ready for commissioning.

Sectors
  • Oil & gas
  • Petrochemical
  • Fertiliser
  • Power
  • Water & desalination
  • Heavy industry

Thirty years of execution behind every scope.