Safety and quality are the scope
On a mechanical subcontract, quality is not a department. It is the sequence of hold points, tests and records that lets a main contractor sign off the system. This is how we execute and evidence it.
Inspection and test plans are agreed with the main contractor before mobilisation, with hold and witness points fixed against the construction programme. Welding procedures and welder qualifications are in place before the first joint.
- Inspection and test plans (ITPs) agreed before mobilisation
- Hold points and witness points fixed against the programme
- Qualified welding procedures and welder performance qualifications
- Dimensional control: roundness, peaking, banding, verticality
- NDT coordination and third-party inspection support
- Punch listing, clearance and mechanical completion dossiers
- Pressure testing
- Hydrostatic · pneumatic
- Leak testing
- Vacuum box · soap film · tracer
- Tank dimensional
- Roundness · peaking · banding · verticality
- NDT
- RT · UT · MPI · DPI (coordinated)
- Surface treatment
- Pickling & passivation of stainless
- Completion
- Punch clearance · dossier handover
- Storage tanks
- API 650 · API 620
- Process piping
- ASME B31.3
- Power piping
- ASME B31.1
- Pressure vessels
- ASME Section VIII Div. 1
- Welding
- ASME Section IX
Our general manager has executed to the project specifications of Aramco, Technip, Uhde, TTIL and AGIP, alongside ASME and API codes.
Work at height, confined space entry, hot work and heavy lifting are the four activities that define tank erection, and the four that have to be planned before anyone mobilises.
- Method statements and risk assessments issued before mobilisation
- Permit-to-work discipline on operating plant
- Confined space entry procedures for tank internals
- Work-at-height and scaffolding control during shell erection
- Hot work control and fire watch during welding
- Lifting plans for roof structure and heavy sections
- Toolbox talks and daily activity briefing