Built on thirty years of steel
Storage tanks, industrial piping and mechanical construction for the oil & gas, petrochemical, power and water sectors, delivered from fabrication through commissioning.
- Codes
- ASME · API
- Project experience
- Orascom · Tecnimont · Bechtel · Petrojet
- Countries
- Egypt · Algeria · Iraq
The experience behind the company
TEMCO is a young company. Its leadership is not. Three decades of mechanical construction across Egypt, Algeria and Iraq.
Delivered by our founder in his roles at Petrojet and Orascom Construction, prior to founding TEMCO.
Read the full record →What we build
- 01Storage tanksField-erected tanks from foundation to mechanical completion.
- 02Piping systemsProcess and utility networks in carbon, stainless and duplex.
- 03Structural steelFabrication and erection, from pipe racks to stacks.
- 04Pressure vesselsInstallation and mechanical equipment set to code.
- 05Testing & pre-commissioningHydrotest, pickling, passivation and mechanical completion.
- 06Maintenance & shutdownsRevamps and turnarounds inside a compressed window.






- Fixed & floating roof
- Single & double shell
- Carbon · stainless · 9% Ni cryogenic
- Shell courses · annular plates · roof structure
- Vacuum, peaking, banding & verticality checks
01 / 06·Overhead view of a storage tank under construction
One scope, one accountability
Fabrication through erection, welding, testing, pickling and passivation to mechanical completion, handed over ready for commissioning and executed to ASME and API codes.
- 01Fabrication
- 02Erection
- 03Welding
- 04Hydrotest
- 05Passivation
- 06Completion
- 07Handover

KIMA Nitric Acid & Ammonium Nitrate Complex
A complete package for the construction and mechanical completion of stainless steel storage tanks, extending beyond fabrication and erection to testing, pickling, passivation and final system readiness.
- Client
- Egyptian Chemical Industries (KIMA)
- Main contractor
- Orascom Construction / Tecnimont
- Location
- Aswan, Egypt
- Scope
- 5 field-erected stainless tanks
Why main contractors award us the scope
- 01
Leadership that has already built it
Our founder's three decades on site: 90+ storage tanks, 35+ coded pressure vessels, and full mechanical discipline responsibility on projects up to 1,500 MW, with Petrojet and Orascom Construction, prior to founding TEMCO.
- 02
Depth in the hardest tanks
Double-wall ammonia, 9% nickel cryogenic and stainless steel for corrosive process service. These are the classes of field-erected tank most contractors decline to price.
- 03
Complete scope, one accountability
Fabrication through erection, welding, testing, pickling, passivation and mechanical completion, handed over ready for commissioning and not split across four subcontractors.
- 04
Built for EPC delivery
ASME and API codes, client specifications including Aramco, Technip, Uhde, TTIL and AGIP, and QA/QC and HSE discipline that survives main-contractor audit.